Architecture, Engineering & Construction

Accelerate Construction. Eliminate Rework.

Achieve a 30% reduction in RFIs and 20% schedule compression with our 24-hour visualization loop.

Live Asset

Navigate a Real LCC 3D Scan

Orbit, pan, and zoom through this full-resolution scan captured with Pivora hardware.

Don't Let Data Lag Derail Your Project.

Brittle meshes, 100 GB point clouds, and manual post-processing slow critical site decisions. You cannot afford to wait 14 days to verify field conditions.

The Solution

Pivora's hybrid solution automates point cloud classification using deep learning. We turn a mobile scan into a navigable 4D Snapshot in just 4 hours, giving your team immediate, actionable clarity.

01

Capture

Mobile SLAM

02

Process

AI Classification

03

Deliver

LOD 300 BIM + 3DGS

Case Study

A top-tier general contractor faced millions in potential rework due to outdated structural data on a hospital retrofit.

$16M

Saved in Rework

20%

Coordination Disruptions Reduced

24hr

Visualization Loop

By replacing legacy terrestrial laser scanning with our 24-hour visualization loop, the team avoided critical design clashes, saving $16M and shrinking coordination disruptions by 20%.

Calculate Your Hybrid Savings.

For every 1% invested in reality capture, clients save an average of 11% of total project value.

Savings = Project Value × Capture Spend % × 11

$10M$500M
0.5%5%

Investment: $500K  →  Projected Savings: $5.5M

Return Per $1K Invested

$11000

Estimated Savings

$5.5M

Methodology & Data Validation

Our 11x savings multiplier is derived from 2026 industry benchmarks across large-scale AEC deployments. Documented project outcomes prove that for every 1% of total project value invested in a hybrid reality capture pipeline, clients realize an average of 11% savings in total project costs.

  • Rework Elimination: Averting design clashes and field errors prevents an average of $16M in losses on major projects.
  • Labor Reduction: The hybrid LiDAR-to-3DGS workflow reduces field capture labor by 50% to 70%.
  • Schedule Compression: Accelerating visualization to under 24 hours cuts coordination disruptions and compresses schedules by up to 20%.